Remarks Welcomed and Details Sessions on the Summary of the Preliminary Task Description
What is occurring?
OTTAWA, ON, July 14, 2025/ CNW/ – WattBridge Energy IPP Holdings LLC, a subsidiary of PROENERGY Holding Business Inc., is proposing the Centre Town Renewables Combination and Grid Security Task, a brand-new electrical power generation center, situated in Centre Town, near Sackville, in southeastern New Brunswick The Effect Evaluation Firm of Canada (IAAC) welcomes Native Peoples and the general public to examine the summary of the Preliminary Task Description and supply talk about the proposed task. This feedback will assist IAAC prepare a summary of problems that will be offered to the advocate.
How can I get involved?
Remarks need to be sent online by going to the task web page on the Canadian Effect Evaluation Windows registry (recommendation number 89719). The summary of the Preliminary Task Description is likewise readily available on the Windows registry. Individuals who want to supply input in a various format can get in touch with IAAC by composing to CentreVillage@iaac-aeic.gc.ca.
Send your remarks online by 11:59 p.m. on August 1, 2025 All remarks got will be released online as part of the task file.
Individual financing will be readily available to qualified individuals throughout this remark duration and information will be revealed soon on the Windows registry. IAAC will retroactively compensate qualified individuals for their involvement expenses in this very first remark duration.
Virtual Details Sessions
IAAC welcomes Native Peoples and the general public to go to a details session by means of Zoom to get more information about the task, the effect evaluation procedure, and how to send talk about the summary of the Preliminary Task Description.
- July 21, 2025, from 6:30 p.m. to 8:00 p.m. ADT (English)
- July 22, 2025, from 1:30 p.m. to 3:00 p.m. ADT (English)
- July 22, 2025, from 6:30 p.m. to 8:00 p.m. ADT (French)
For details on how to go to a session, please go to the task web page on the Windows registry and click “Details Sessions” If you have any concerns, please contact IAAC utilizing the task e-mail above.
What is the proposed task?
WattBridge Energy IPP Holdings LLC, a subsidiary of PROENERGY Holding Business Inc., is proposing to construct, run and decommission the Centre Town Renewables Combination and Grid Security Task, a brand-new electrical power generation center, situated in Centre Town, near Sackville, in southeastern New Brunswick As proposed, the task would have capability to produce approximately 500 megawatts of electrical power utilizing gas turbines and would run as required to preserve system dependability and supply back-up energy generation. The task is anticipated to run for about 25 years.
Stay upgraded by following IAAC on X: @IAAC_AEIC, #CentreVillageRIGS or sign-up for notices on the Canadian Effect Evaluation Computer Registry.
SOURCE Effect Evaluation Firm of Canada